Browsing articles in "Projects"

15m HIGH EXTRUDER TOWER

Aug 29, 2012   //   by admin   //   Projects  //  No Comments

This steel structure rises over multiple storeys to support machinery used to make plastic bags.

2,500m2 WAREHOUSE

Aug 29, 2012   //   by admin   //   Projects  //  No Comments

Completed in record time, this structure was recently erected for a longstanding client in addition to several other buildings on the premises. With a highly flammable by-product being stored inside, extensive research was put into the use of fire extinguishers, sprinkler systems and fire resistant coatings.

8.5m HIGH WAREHOUSE

Aug 29, 2012   //   by admin   //   Projects  //  No Comments

The Medupi power station has been behind schedule in the cons

117m LONG WAREHOUSE

Aug 29, 2012   //   by admin   //   Projects  //  No Comments

This 35m clear span warehouse structure was erected in Kwamakhutha on time and in accordance with the client’s specification as part of a 9000m2 development.

8,000 m2 TURNKEY PROJECT

Jun 18, 2012   //   by admin   //   Projects  //  No Comments

The scope of work at Sebenza Forwarding & Shipping saw CSI provide a turnkey service for the building of a logistics and storage facility with an eaves height of 14 metres. CSI and Sebenza continue to enjoy a mutually beneficial relationship with regard to CSI’s export business.

2,000 m2 WAREHOUSE

Jun 18, 2012   //   by admin   //   Projects  //  No Comments

Situated in Durban this structure incorporates a crane rail with a crawl beam, which is efficient in moving large items around the factory floor.

27,000 m2 WAREHOUSE

Jun 18, 2012   //   by admin   //   Projects  //  No Comments

This storage facility for a fertilizer plan was built by CSL in Richard Bay. The client specifications necessitated design for the ability to house a 40 truck train under a single roof which spans 120 meters.

8 STOREY PROCESS STRUCTURE

Jun 18, 2012   //   by admin   //   Projects  //  No Comments

Three complex structures totalling 500 tonnes were manufactured for this Ammonium Sulphate Mine located in Ambatovy, Madagascar. Being in the cyclone belt, the structures were designed to withstand the 300 kph winds likely to be experienced. The stringent specifications stipulated by mining authorities called for grit blasting followed by zinc-rich epoxy double coating to withstand the highly corrosive environment created by the mining process.

 

 

10,800 m2 WAREHOUSE

Jun 18, 2012   //   by admin   //   Projects  //  No Comments

Situated in Isando, Johannesburg this 250 tonne steel structure is built around a food processing facility for Willowton Oil. Designed around the requirements of the client, the structure rises 36 metres high over 6 floors to accommodate a 32m tank.

35,000 m2 COLD Store

Jun 18, 2012   //   by admin   //   Projects  //  No Comments

Situated at 1462 South Coast Road in Durban, this structure is one of several large storage facilities erected in the area and is an integral part of the South African food export industry. The building was designed to provide a highly advanced, smooth-running operation linking the port logistics with the storage facility.

Pages:12»